Completed
Projects.

Selected sample work — procedure-driven production across machinery, structural steel, energy, railway and process equipment.

ArmaWeld imalat projesi referansı Sample work · Procedures & dossier
FILTER · SECTOR
HARDOX kepçe imalatı
■ 01 · OEM PRODUCTION
’25
MACHINERY
MACHINERY MANUFACTURING

Excavator Bucket Series — 32 Units

HARDOX 500 wear-resistant excavator buckets. Repeatable quality production in 3 different sizes.

Quantity
32 / year
Material
HARDOX 500
NDT
VT + MT 20%
Serial bucket production with repeatable WPS and per-part VT/MT plan.
Yapısal çelik kaynaklı imalat
■ 02 · EN 1090 EXC2
’24
STRUCTURAL
STRUCTURAL STEEL

Logistics Warehouse Main Frame — 2,400 m²

Single-storey, 20m span portal-frame warehouse. Roof trusses, columns, purlins, base plates — complete factory fabrication.

Tonnage
142 t
Class
EXC2
Duration
14 weeks
Warehouse primary structure with EXC2/EXC3 dossier and dimensional report.
TIG kaynak - basınçlı kap imalatı
■ 03 · PED CAT.II
’25
PRESSURE
PROCESS

Stainless Mixing Reactor — 5 m³

316L stainless steel process reactor. TIG root + MIG fill hybrid WPS, 100% RT inspection, CE marking under PED Category II.

Volume
5,000 L
Pressure
8 bar
NDT
RT 100%
Reactor under PED with TIG/MIG WPS, 100% RT and CE dossier.
■ 04 · SOLAR STRUCTURE
’25
G
ENERGY
ENERGY / SOLAR

42 MWp Solar Farm Mounting Structures

920 tripod-foot PV mounting constructions. Hot-dip galvanised S275 steel. Production + on-site delivery under DIN EN 1090 EXC2.

Quantity
920
Coating
HDG 85 µm
Lifespan
25 years (C5)
PV structure with HDG coating, cut tolerance control and assembly support.
Demiryolu boji çerçevesi imalatı
■ 05 · EN 15085 CL1
’24
RAIL
RAILWAY

Service Vehicle Bogie Frame — 6 Sets

Railway service vehicle bogie main frame, fatigue-calculated and 100% UT-inspected under EN 15085 CL1.

Quantity
6 sets
Class
CL1 · EXC3
NDT
UT 100%
Bogie frame with EN 15085 CL1 record chain and 100% UT.
Büküm ve şekillendirme imalat
■ 06 · INDUSTRIAL PLT.
’25
PLATFORM
STRUCTURAL STEEL

3-Storey Service Platform & Gallery Stair

3-storey service platform for process plant maintenance teams. Complete delivery with grating, handrails, stairs and landings.

Length
12 m × 3 floors
Tonnage
28 t
Load
5 kN/m²
Platform, stairs and handrails — delivered with assembly list and surface prep.
02 / Reference Voices

VOC — 003

Customer feedback validates project quality.

“
It was the first time we worked with a supplier whose document package came so complete. We left no question marks at the site audit — all WPS, NDT and material records were ready.
VM
V. Mercan
Quality Manager · Energy OEM
“
For series bucket production we expected both punctuality and repeatable quality. ArmaWeld has been delivering this discipline consistently for three years.
AK
A. Kılıç
Procurement Manager · Heavy Equipment OEM
“
On our pressure vessel project, we worked with a single team from design phase to CE DoP. Commissioning passed without any issues.
SE
S. Erkan
Project Engineer · Chemical Plant
03 / Process & Quality

STATS — TOTAL

Our production process in measurable commitments.

Avg. Quote Time
48hours
After technical file review
Structural Steel
EN 1090 EXC3
Factory production control · EXC3
Welder Qualifications
100%
EN ISO 9606-1 · active crew
NDT Methods
4methods
In-house · Level 2 staff